Design Review Board Regular Meeting http://www.roswellgov.com/ ~Agenda~ Chair Jeffrey Green Vice Chair Mark Stovall Board Member Ian Atkinson Board Member Michael Guobaitis Board Member Arie Kohn Board Member Phiffer Reed Tuesday, September 2, 2025 6:30 PM City Hall - Council Chambers \ Possible Quorum of Mayor and City Council \* Welcome - I. Call to Order - II. Discussion - 1. Fire Station 27 - 9000 Fouts Road - 2. Public Safety Headquarters - 1080 Holcomb Bridge Road - 3. Police Headquarters Evidence Building - 1080 Holcomb Bridge Road - 4. Liberty Square Park - Mission Hills Ct. & Worthington Hills Dr. III. Approval of Minutes - 5. June 17, 2025, Special Called DRB Minutes - IV. Adjournment**
City of Roswell Design Review Board AGENDA ITEM REPORT ID # - 10020 MEETING DATE: September 2, 2025 DEPARTMENT: Design Review Board ITEM TYPE: Discussion Fire Station 27 9000 Fouts Road Item Summary: DRB discussion for the proposed new Fire Station # 27 located at 9000 Fouts Road. Committee or Staff Recommendation: Discussion Financial Impact: N/A Recommended Motion: Discussion item Presented by: Josh Pape, CIP Construction Administrator and Brian Watson, Director of EPW
$ZONING = REC$ BUFFER REQUIREMENTS NOT REQUIRED PER 10.2.3 TREES/S PARKING REQUIREMENTS $N/A IFOHUTILITY STREET TREES PROVIDED $\equiv$ 25 DENSITY GROUND REQUIRED DENSITY 30 UNITS/ACRE NUMBER OF ACRES = 5.38 ACRES Alternate 1 REQUIRED DENSITY $=$ 161 UNITS EXITING DENSITY $=$ 142.1 UNITS TUR REPLACEMENT 4" CAL NO. 21 UNITEA 0.9 TOTAL 18.9 Alternate 1 TOTAL REPLACEMENT UNITS $=$ 19 UNITS Alternate 1 ** TOTAL PROPOSED TREE DENSITY = 161 UNITS $\mathsf{PROMDED} \simeq \mathsf{REQUIRED}$ SPECIMEN TREE CALCULATIONS UNKNOWN Tree Survey has not yet been obtained by Owner EXISTING TREE CALCULATIONS UNKNOWN Tree Survey has not yet been obtained by Owner GENERAL PLANTING NOTES 1. ALL PLANTS MUST BE HEALTHY, VIGOROUS AND FREE OF PESTS & DISEASE. 2. ALL PLANTS MUST BE CONTAINER-GROWN OR BALLED AND BURLAPPED AS INDICATED IN THE PLANT LIST. ALL TREES MUST BE FULL HEADED AND MEET ALL REQUIREMENTS SPECIFIED. 4. ALL PLANTS ARE SUBJECT TO THE APPROVAL OF THE LANDSCAPE ARCHITECT AND THE OWNER BEFORE, DURING AND AFTER INSTALLATION AND MUST BE REPLACED WITH ACCEPTABLE PLANT MATERIAL. 5. ALL TREES MUST BE GUYED OR STAKED AS SHOWN IN THE DETAILS. 6. ALL PLANTS AND PLANTING AREAS MUST BE COMPLETELY MULCHED AS SHOWN IN DETAILS. 7. PRIOR TO CONSTRUCTION; THE LANDSCAPE CONTRACTOR SHALL BE RESPONSIBLE FOR LOCATING ALL UNDERGROUND UTILITIES AND SHALL AVOID DAMAGE TO ALL UTILITIES DURING THE COURSE OF THE WORK. THE LANDSCAPE CONTRACTOR IS RESPONSIBLE FOR REPAIRING ANY AND ALL DAMAGE TO UTILITIES, STRUCTURES, SITE APPURTENANCES, ETC., WHICH OCCURS AS A RESULT OF THE LANDSCAPE CONSTRUCTION. 8. THE LANDSCAPE CONTRACTOR IS RESPONSIBLE FOR VERIFYING ALL QUANTITIES SHOWN ON THESE PLANS, BEFORE PRICING THE WORK. 9. THE LANDSCAPE CONTRACTOR IS RESPONSIBLE FOR FULLY MAINTAINING ALL PLANTING (INCLUDING, BUT NOT LIMITED TO: WATERING, SPRAYING, MULCHING, FERTILIZING, ETC.) OF PLANTING AREAS AND LAWNS UNTIL THE WORK IS ACCEPTED IN TOTAL BY THE LANDSCAPE ARCHITECT AND THE OWNER. 10. THE LANDSCAPE CONTRACTOR SHALL COMPLETELY GUARANTEE ALL PLANT MATERIAL FOR A PERIOD OF ONE (1) YEAR BEGINNING AT THE DATE OF TOTAL ACCEPTANCE. THE LANDSCAPE CONTRACTOR SHALL PROMPTLY MAKE ALL REPLACEMENTS BEFORE OR AT THE END OF THE GUARANTEE PERIOD (AS PER DIRECTION OF THE OWNER). (INCLUDING WATERING) THROUGHOUT THE ONE-YEAR GUARANTEE PERIOD UNLESS OTHERWISE DETERMINED. PLANT MATERIAL PRIOR TO INSTALLATION. TO TOTAL ACCEPTANCE OF THE WORK) SHALL BE PROMPTLY REMOVED FROM THE SITE AND REPLACED WITH MATERIAL OF THE SAME SPECIES, QUANTITY, SIZE, AND MEETING ALL PLANT LIST SPECIFICATIONS. ARE ONLY GUIDELINE SPECIFICATIONS AND SHALL BE CONSIDERED MINIMUM QUALITY REQUIREMENTS FOR PLANT MATERIAL. BE MULCHED WITH PINESTRAW OR PINEBARK MULCH. THE GENERAL CONTRACTOR SHALL PROVIDE THE OWNER WITH A PERMANENT IRRIGATION DESIGN FOR THE PROF THE PERMANENT IRRIGATION CONTROLLER SHALL BE LOCATED IN THE MECHANICAL ROOM AND POSITIONED TO A DESIGNATED IRRIGATION WATER METER SHALL BE PROVIDED ON THE SITE. REFER TO SITE WATER AND SEWER 11. THE CONTRACTOR AGREES TO PERFORM ALL LANDSCAPE MAINTENANCE 12. THE LANDSCAPE ARCHITECT WILL APPROVE THE STAKED LOCATION OF ALL 13. ANY PLANT MATERIAL WHICH DIES, TURNS BROWN OR DEFOLIATES (PRIOR 14. STANDARDS SET FORTH IN "AMERICAN STANDARD FOR NURSERY STOCK" 15. REMAINING GROUND COVER TO BE SOD OR SEED AND PLANTING AREAS TO IRRIGATION PERFORMANCE SPECIFICATIONS 1. SUBMITTED TO THE OWNER AND LANDSCAPE ARCHITECT FOR REVIEW AND APPROVAL PRIOR TO INSTALLATION. THE F 2. PERMANENT IRRIGATION SHALL INCLUDE DESIGN FOR FULL COVERAGE FOR ALL PROPOSED LANDSCAPE BEDS, G BE SPACED A MINIMUM OF 24" ON CENTER. ALL LANDSCAPED MATERIALS ARE TO RECEIVE TEMPORARY IRRIGATION, SUFFICIENT TO PROMOTE HEALTHY VIGO OFF AT THEIR DISCRETION. TEMPORARY IRRIGATION SHALL BE PROVIDED AT NO ADDITIONAL COST TO THE OWNER 4. 5. CONTRACTOR. THE CONTRACTOR SHALL PROVIDE AND INSTALL A REDUCED PRESSURE BACKFLOW PREVENTER, ACCEPTABLE TO 6. THE LANDSCAPE/IRRIGATION CONTRACTOR SHALL INSTALL PVC SLEEVES UNDER DRIVES AND SIDEWALKS TO INS 7. SCHEDULE 40 PVC OR APPROVED EQUAL. 8. IRRIGATION VALVES, SPRAY HEADS, CONTROLLER AND/OR DRIP IRRIGATION PIPING SHALL BE RAIN BIRD, TORO, THE GENERAL CONTRACTOR SHALL PROVIDE THE FOLLOWING TO THE OWNER PRIOR TO ACCEPTANCE OF THE PE 9. SYMBOL NO. COMMAN STRIP FT Fringe $\mathsf{RB}$ Red B $\mathsf{SB}$ Service E $\mathsf{T}\mathsf{M}$ Trident N CC Ironwo $GA$ Green Eastern Re $\mathsf{RC}$ EA. R٢ Virginia Sw $\mathsf{D}\mathsf{Y}\mathsf{H}$ 99 Dwarf Yaup $\mathsf{AB}$ American Be Dwarf Fotl Camel $\mathsf{CH}$ Chineese OCOVER SQFT 25975 JH Creeping. $\mathsf{CP}$ 640 Creeping $\mathsf{PV}$ 1520 Homestead Pur SQFT SOD 30810 BERMUDA ( BERMUDA SOD 25975 ALTERNATE 1 ELLIMINATES JUNIP AREAS WITHIN THE LIMITS OF DISTURBANCE NOT STABILIZED WITH SOD MULCH OR PAVING SHALL BE PERMANENTLY STABILIZED WITH BERMUDA SEED REFER TO EROSION CONTROL PLAN FOR PERMANENT SEEDING INFORMATION. POSED PLANTINGS AS A DESIGN BUILD COMPONENT OF THE CONTRACT. THE IRRIGATION DESIGN SHALL BE PROVIDED AT NO ADDITIONAL COST TO THE OWNER. THE PERMANENT IRRIGATION DESIGN SHALL BE PERMANENT IRRIGATION SYSTEM SHALL BE INSTALLED BY THE LANDSCAPE CONTRACTOR. GROUNDCOVER, SHRUBS, TREES AND LAWN AREAS. DRIP IRRIGATION SHALL BE UTILIZED FOR TREES, SHRUBS AND GROUNDCOVER IRRIGATION TO THE FULLEST EXTENT POSSIBLE AND DRIP LINE ROWS SHALL OROUS PLANT LIFE UNTIL THE PERMANENT IRRIGATION SYSTEM IS INSTALLED AND OPERATIONAL. TEMPORARY IRRIGATION SYSTEM SHALL BE CONFIGURED TO ALLOW THE OWNER TO TURN THE SYSTEM ON AND ) ALLOW ELECTRICAL CONNECTION TO AN ACCESSIBLE POWER RECEPTACLE AND CIRCUITED TO THE ELECTRICAL PANEL IN THE BUILDING. ER PLANS FOR PROPOSED IRRIGATION METER LOCATION. ALL IRRIGATION COMPONENTS ON THE PROPERTY SIDE OF THE IRRIGATION METER AND THE VALVE ARE TO BE DESIGNED AND INSTALLED BY THE TO THE LOCAL ISSUING AUTHORITY, SIZED TO MATCH THE PROPOSED IRRIGATION METER IN A HEATED ENCLOSURE WITH ALL CONNECTIONS AND APPURTENANCES AT NO ADDITIONAL COST TO THE OWNER. NSTALL IRRIGATION PIPING AND ELECTRICAL WIRING FOR IRRIGATION CONTROL VALVES. IRRIGATION SLEEVES SHALL BE TWICE THE DIAMETER OF THE LARGEST CONDUIT CARRIED BY THE SLEEVE AND SHALL BE , HUNTER OR OTHER APPROVED EQUAL. PERMANENT IRRIGATION SYSTEM; SITE MAP SHALL FIT COMPLETELY INTO THE IRRIGATION CONTROLLER ENCLOSURE. ON 24"X36" INSTALLED PERMANENT IRRIGATION SYSTEM OPERATION AND REPAIR. PLANTING SCHEDULE TREE PROTECTION NOTES NAME BOTANICAL NAME SIZE CONDITION REMARKS %native CONTACT THE DEPARTMENT OF PUBLIC WORKS TO ARRANGE A SITE Гrее Chionanthus virginicus 'Emerald Knight' 2"cal B&B min. 8' hieght LAND DISTURBANCE. ud Cercis Canadensis 'Forest Pansy' 2"cal B&B min. 8' hieght 2. ALL TREE PROTECTION MEASURES SHALL BE INSTALLED PRIOR TO GR Berry Amelanchier arborea 'Autumn Sunset' 4"cal B&B min. 12' hieght Maple Acer Buergeranum 'Streetwise' 4"cal B&B Min.12' Hieght 3. UNDISTURBED BUFFERS SHALL BE REPLANTED TO BUFFER STANDARD boc Carpinus caroliniana 'J.N. Globe' 4"cal B&B Min.12' Hieght VEGETATED OR WHERE DISTURBED AT APPROVED UTILITY CROSSINGS. $\mathsf{Ash}$ Fraxinus pennsylvanica 'Kindred' 4"cal B&B Min. 12' Hieght ALL LANDSCAPING SHALL BE IN PLACE PRIOR TO THE ISSUANCE OF d Cedar Juniperus virginiana 'Nova' 2"cal B&B Min. 8' Hieght OCCUPANCY FOR THE FINAL PHASE OF DEVELOPMENT, OR RECORDING 100% 5. CONTACT THE DEPT. OF PUBLIC WORKS FOR SITE INSPECTION UPON INSTALLATION. 6. ALL CLEARING LIMITS TO BE FLAGGED IN FIELD PRIOR TO CLEARING eetspire Itea virginica 'Henry's Garnett' 3 GAL CONTAINER 3' O.C.E.W. on Holly Ilex vomitoria 'Stokes Dwarf' 3 GAL CONTAINER 3' O.C.E.W. 7. NO BURN OR BURY PITS SHALL BE ALLOWED, UNLESS LOCATION BY THE ENGINEER AND THE INSPECTOR. auty Berry Callicarpa americana 3 GAL CONTAINER 18" TALL MIN hergilla Forthergilla gardenii 'Blue Mist' 3 GAL CONTAINER 18" TALL MIN 8. TREE TAPE SHALL BE PLACED AS SHOWN TO INDICATE AREAS OF 1 lia Camellia Sasanqua 'Kanjiro' 7 GAL CONTAINER 24" TALL MIN EXISTING TREES MAY POTENTIALLY BE SAVED. REVEGETATION SHALL ACHIEVE BUFFER STANDARDS IN SPARSELY VEGETA ALSO TO Holly Ilex cornuta 'Nellie R. Stephens' 15GAL CONTAINER 36"' TALL MIN. 95% REPLANTINGS ARE SUBJECT TO COUNTY ARBORIST APPROVAL. 9. ADDITIONAL TREE TAPE AND/OR TREE FENCE TO BE PLACED AS luniper Juniperus horizontalis 4"POT CONTAINER 36" O.C. E.W. DIRECTED BY THE ENGINEER AND/OR ARBORIST. Phlox Phlox divaricata 4"POT CONTAINER 12" O.C.E.W. ple Verbena Verbena Canadensis 4"POT CONTAINER 12" O.C.E.W. 100% GRASS Cynodon Dactylon SOD PALLET rolled or stacked GRASS Cynodon Dactylon SOD PALLET rolled or stacked 0% note: all bermuda grass shall be tiftuf variety PER PLANTING ON SLOPE AND CONTRACTOR INSTALLS. 25975 BERMUDA SOD IN LIEU OF NATIVE JUNIPER ON SLOPE E. A MAINTENANCE AND OPERATIONS DEMONSTRATION FOR THE OWNER TO BE COORDINATED AND SCHEDULED BY THE CONTRACTOR AT A TIME CONVENIENT TO THE OWNER, THE LANDSCAPE CONTRACTOR, AND THE GENERAL CONTRACTOR. - TO ARRANGE A SITE INSPECTION PRIOR TO ANY - INSTALLED PRIOR TO GRADING. - TO BUFFER STANDARDS WHERE SPARSELY VED UTILITY CROSSINGS. - R TO THE ISSUANCE OF A CERTIFICATE OF LOPMENT, OR RECORDING OF THE FINAL PLAT. - SITE INSPECTION UPON COMPLETION OF LANDSCAPE - PRIOR TO CLEARING - ) INDICATE AREAS OF TREE PROTECTION WHERE ). REVEGETATION SHALL OCCUR IN THESE AREAS PREVIOUSLY APPROVED - S IN SPARSELY VEGETATED AREAS. - 1. SEE GENERAL NOTES. - 2. ALL TREES LOCATED OUTSIDE OF PLANTING BEDS SHALL BE MULCHED, 4" THICK, IN A 4' DIAMETER CIRCLE AROUND THE TRUNK OF THE TREE. - SUBSTITUTION OF PLANT MATERIALS BASED ON AVAILABILITY, ETC., MUST BE APPROVED IN WRITING BY THE LANDSCAPE ARCHITECT OR ARCHITECT PRIOR TO INSTALLATION. - 4. ALL PLANT MATERIAL SHALL COMPLY WITH THE PROVISIONS SET FORTH BY THE AMERICAN STANDARD FOR NURSERY STOCK, ANSI Z60.1 (LATEST EDITION) - 5. PRIOR TO ORDERING ANY PLANT MATERIALS, CONTRACTOR SHALL VERIFY THE SELECTED PLANTS WILL SURVIVE BASED ON LOCAL SITE CONDITIONS / ZONES. - 6. ALL DISTURBED AREAS NOT PLANTED TO BE SODDED, MULCHED OR SEEDED. - 7. LANDSCAPE AND IRRIGATION CONTRACTOR IF APPLICABLE SHALL BE THE SAME. - 8. FULL IRRIGATION COVERAGE SHALL BE PROVIDED FOR ALL NEW PLANTINGS- TREES, SHRUBS, GROUND COVERS AND TURF. 9. CONTRACTOR SHALL PROVIDE AN IRRIGATION DESIGN AND SHOP DRAWINGS TO THE ARCHITECT FOR REVIEW AND APPROVAL PRIOR TO PLANTING INSTALLATION.REFER TO SPECIFICATIONS. IRRIGATION DESIGN, SHOP DRAWINGS, AND SPECIFICATIONS SHALL BE PROVIDED AT NO ADDITIONAL COST TO THE OWNER. - 10. TOTAL PLANT SPECIES TABULATIONS ARE PROVIDED ON THE PLANTING SCHEDULE FOR THE GRAPHIC SCALE ( IN FEET $1 \text{ inch} = 30 \text{ ft.}$ ■PERMIT SUBMITTAL
City of Roswell Design Review Board AGENDA ITEM REPORT ID # - 10028 MEETING DATE: September 2, 2025 DEPARTMENT: Design Review Board ITEM TYPE: Discussion Public Safety Headquarters 1080 Holcomb Bridge Road Item Summary: DRB discussion for the proposed exterior changes for the new Public Safety Headquarters located at 1080 Holcomb Bridge Road. Committee or Staff Recommendation: Discussion Financial Impact: N/A Recommended Motion: Discussion item Presented by: Josh Pape, CIP Construction Administrator and Brian Watson, Director of EPW
Packet Pg. 8
City of Roswell Design Review Board AGENDA ITEM REPORT ID # - 10021 MEETING DATE: September 2, 2025 DEPARTMENT: Design Review Board ITEM TYPE: Discussion Police Headquarters Evidence Building 1080 Holcomb Bridge Road Item Summary: DRB discussion for the new evidence building located at the Public Safety Headquarters at 1080 Holcomb Bridge Road. Committee or Staff Recommendation: Discussion Financial Impact: N/A Recommended Motion: Discussion item Presented by: Josh Pape, CIP Construction Administrator and Brian Watson, Director of EPW
Packet Pg. 11
Building created for: City of Roswell 1080 Holcomb Bridge Road Roswell GA 30076 Produced by: Steel and Metal Systems
Building created for: City of Roswell 1080 Holcomb Bridge Road Roswell GA 30076 Produced by: Steel and Metal Systems
Attachment: Rendering (Police Headquarters Evidence Building)
City of Roswell Design Review Board AGENDA ITEM REPORT ID # - 10022 MEETING DATE: September 2, 2025 DEPARTMENT: Design Review Board ITEM TYPE: Discussion Liberty Square Park Mission Hills Ct. & Worthington Hills Dr. Item Summary: DRB discussion for Liberty Square Park located at Mission Hills Ct. & Worthington Hills Dr. Committee or Staff Recommendation: Discussion Financial Impact: N/A Recommended Motion: Discussion item Presented by: Elan Buchen, Community Design Manager
Liberty Square Park Design Review Board 8.25.25 Presenting: Elan Buchen, City of Roswell, Community Design Manager
Packet Pg. 19
Liberty Square Park Pavilion area Attachment: LSP-DRB Presentation 8.25.25 (Liberty Square Park- Mission Hills Ct. &
Liberty Square park Pavilion elevations EXTERIOR FINISH SCHEDULE FC-1 FIBER CEMENT BOARD TRUEXTERIOR FIBER CEMENT TRIM. WOODGRAIN TRIM BOARDS, COLOR: SHERWIN-WILLIAMS, SW 7501 "THRESHOLD TAUPE" (C5) P-1 PAINT SHERWIN WILLIAMS PAINTED STEEL DOOR AND FRAME, COLOR: SHERWIN-WILLIAMS, SHERWIN-WILLIAMS, SW 6010, "FLEXIBLE GRAY" (C3) P-2 PAINT SHERWIN WILLIAMS PAINTED STEEL COLUMN, COLOR TO MATCH SHERWIN-WILLIAMS, "SW 6461 "ISLE OF PINES" (C7) PB-1 SHOOTH FACE BLOCK ECHELON PAINTED SMOOTH FACE BLOCK WITH ARGOS "MAGNOLIA MASON'S MIX" MORTAR, TOOLED JOINTS, COLOR: SHERWIN-WILLIAMS, SW 6010, "FLEXIBLE GRAY" (C3) $PB-2$ SPLIT FACE BLOCK ECHELON PAINTED SPLIT FACE BLOCK WITH ARGOS "MAGNOLIA MASON'S MIX" MORTAR. TOOLED JOINTS. COLOR: SHERWIN-WILLIAMS. SW 6012, "BROWSE BROWN" (C6) $M-1$ METAL PAC-CLAD METAL GUTTER, COLOR: "MATTE BLACK" SH-1 ASPHALT SHINGLE CERTAINTEED ARCHITECTURAL SHINGLE, COLOR: "COLONIAL SLATE" Attachment: LSP-DRB Presentation 8.25.25 (Liberty Square Park- Mission Hills Ct. &
Liberty Square Park Pavilion color palette example
Liberty Square Park Dimensioned floor plan Attachment: LSP-DRB Presentation 8.25.25 (Liberty Square Park- Mission Hills Ct. & Packet Pg. 26
Attachment: LSP-DRB Presentation 8.25.25 (Liberty Square Park- Mission Hills Ct. &
Questions?
Design Review Board AGENDA ITEM REPORT ID # - 10029 MEETING DATE: September 2, 2025 DEPARTMENT: Design Review Board ITEM TYPE: Minutes June 17, 2025, Special Called DRB Minutes Item Summary: Committee or Staff Recommendation: On (date) the (name of Committee) Committee recommended placing this Item on the (date) Mayor and Council Agenda. Financial Impact: Recommended Motion: Presented by:
Design Review Board Special Called Meeting http://www.roswellgov.com/ ~Minutes~ Chair Jeffrey Green Vice Chair Mark Stovall Board Member Ian Atkinson Board Member Michael Guobaitis Board Member Arie Kohn Board Member Phiffer Reed Tuesday, June 17, 2025 6:30 PM City Hall - Council Chambers \ Possible Quorum of Mayor and City Council \* Welcome I. Call to Order The meeting was called to order at 6:34 PM by Chair Jeffrey Green Chair Jeffrey Green: Present, Vice Chair Mark Stovall: Present, Board Member Ian Atkinson: Absent, Board Member Michael Guobaitis: Present, Board Member Arie Kohn: Present, Board Member Phiffer Reed: Present, Planner II Kristen Thomasberger: Present. II. Initial 1. 20251690 - 2965 Holcomb Bridge Road - Exterior renovations The DRB unanimously voted to hear this item as a final. This item was approved with the following conditions: - 1. The applicant will submit a rendering to staff reflecting the comments from the DRB and the color scheme presented by Board Member Kohn. - 2. A DRB approval letter will not be issued until after the rendering has been submitted and reviewed by the Design Review Board ensuring that it accurately addresses all DRB comments. - 3. Staff comments must be met at requisite permit stage.* RESULT: APPROVED WITH CONDITIONS [UNANIMOUS] MOVER: Mark Stovall, Vice Chair SECONDER: Arie Kohn, Board Member IN FAVOR: Green, Stovall, Guobaitis, Kohn, Reed ABSENT: Ian Atkinson
Special Called Meeting Tuesday, June 17, 2025 6:30 PM III. Approval of Minutes RESULT: APPROVED [UNANIMOUS] MOVER: Michael Guobaitis, Board Member SECONDER: Phiffer Reed, Board Member IN FAVOR: Green, Stovall, Guobaitis, Kohn, Reed ABSENT: Ian Atkinson IV. Adjournment There being no further comments or discussion the meeting was adjourned at 7:02 PM X Jeffrey Green Design Review Board Chair

Images Found in Document

43 image(s) extracted

_page_0_Picture_0.jpeg

_page_0_Picture_0.jpeg

.JPEG

_page_1_Picture_0.jpeg

_page_1_Picture_0.jpeg

.JPEG

_page_2_Figure_0.jpeg

_page_2_Figure_0.jpeg

.JPEG

_page_2_Figure_3.jpeg

_page_2_Figure_3.jpeg

.JPEG

_page_3_Figure_9.jpeg

_page_3_Figure_9.jpeg

.JPEG

_page_3_Figure_33.jpeg

_page_3_Figure_33.jpeg

.JPEG

_page_3_Figure_34.jpeg

_page_3_Figure_34.jpeg

.JPEG

_page_4_Picture_0.jpeg

_page_4_Picture_0.jpeg

.JPEG

_page_5_Picture_0.jpeg

_page_5_Picture_0.jpeg

.JPEG

_page_6_Picture_0.jpeg

_page_6_Picture_0.jpeg

.JPEG

_page_7_Figure_0.jpeg

_page_7_Figure_0.jpeg

.JPEG

_page_7_Figure_17.jpeg

_page_7_Figure_17.jpeg

.JPEG

0__page_8_Picture_0.jpeg

0__page_8_Picture_0.jpeg

.JPEG

0__page_9_Picture_0.jpeg

0__page_9_Picture_0.jpeg

.JPEG

0__page_10_Figure_0.jpeg

0__page_10_Figure_0.jpeg

.JPEG

0__page_10_Figure_2.jpeg

0__page_10_Figure_2.jpeg

.JPEG

0__page_11_Figure_2.jpeg

0__page_11_Figure_2.jpeg

.JPEG

0__page_12_Figure_0.jpeg

0__page_12_Figure_0.jpeg

.JPEG

0__page_13_Figure_2.jpeg

0__page_13_Figure_2.jpeg

.JPEG

0__page_14_Figure_0.jpeg

0__page_14_Figure_0.jpeg

.JPEG

0__page_15_Picture_0.jpeg

0__page_15_Picture_0.jpeg

.JPEG

1__page_17_Picture_1.jpeg

1__page_17_Picture_1.jpeg

.JPEG

1__page_17_Picture_2.jpeg

1__page_17_Picture_2.jpeg

.JPEG

1__page_18_Picture_1.jpeg

1__page_18_Picture_1.jpeg

.JPEG

1__page_19_Picture_1.jpeg

1__page_19_Picture_1.jpeg

.JPEG

1__page_19_Picture_2.jpeg

1__page_19_Picture_2.jpeg

.JPEG

1__page_20_Figure_1.jpeg

1__page_20_Figure_1.jpeg

.JPEG

1__page_21_Figure_1.jpeg

1__page_21_Figure_1.jpeg

.JPEG

1__page_22_Figure_1.jpeg

1__page_22_Figure_1.jpeg

.JPEG

1__page_22_Picture_2.jpeg

1__page_22_Picture_2.jpeg

.JPEG

1__page_23_Picture_1.jpeg

1__page_23_Picture_1.jpeg

.JPEG

1__page_23_Picture_2.jpeg

1__page_23_Picture_2.jpeg

.JPEG

1__page_23_Picture_4.jpeg

1__page_23_Picture_4.jpeg

.JPEG

1__page_23_Picture_10.jpeg

1__page_23_Picture_10.jpeg

.JPEG

2__page_24_Picture_1.jpeg

2__page_24_Picture_1.jpeg

.JPEG

2__page_24_Picture_2.jpeg

2__page_24_Picture_2.jpeg

.JPEG

2__page_25_Figure_1.jpeg

2__page_25_Figure_1.jpeg

.JPEG

2__page_25_Picture_2.jpeg

2__page_25_Picture_2.jpeg

.JPEG

2__page_25_Picture_3.jpeg

2__page_25_Picture_3.jpeg

.JPEG

2__page_26_Figure_0.jpeg

2__page_26_Figure_0.jpeg

.JPEG

2__page_27_Picture_1.jpeg

2__page_27_Picture_1.jpeg

.JPEG

2__page_28_Picture_0.jpeg

2__page_28_Picture_0.jpeg

.JPEG

2__page_29_Picture_1.jpeg

2__page_29_Picture_1.jpeg

.JPEG

Loading...